Lemanco Bin Assembly
Material Storage Systems, Inc. understands the importance of making the bin assembly job as efficient as possible. To assist in this MSSI provides the following:
Bi-lingual assembly manuals.
Drawings for the bin assembly platforms that create a consistent work floor to assure fast and economical erection.
Color-coded components for faster identification.
Detailed assembly drawings.
Recommendation for storage and staging of materials at job site.
Extra fasteners and FDA approved sealant.
Bin erection tips and shortcuts.
Estimates on man-hours and equipment requirements.
Names of experienced contractors who can provide complete assembly or assist on a per diem basis.
Maintenance Manual.
Technical Assistance.
- Due to the unique bin design, a crane is not required after structural steel and hoppers are installed.
- Hoppers are one piece and do not require field assembly.
- New Bin design has fewer parts which enables faster assembly.
Always work safely.
|